What Does Installation Entail?
The final step before you can start your operations is connecting all machines and equipment. This includes everything from electricity, water, and drainage to refrigeration equipment and food waste disposers.
Of course, it is important that technicians with the right expertise ensure that the machines are properly installed and commissioned, and that the necessary protocols are submitted to validate warranties.
Challenges with installation
If installation is not carried out by authorized technicians, it may result in voided factory warranties and the machine not functioning properly. In many cases, calibration is also required during commissioning to adjust all parameters. Many instances of new machines being reported as faulty have been caused by subpar installation by someone lacking the appropriate expertise for this task.
Perfecta's responsibility during installation
We ensure that technicians are scheduled at the right time and synchronized with the mounting team so that everything is prepared. This prevents unnecessary additional time. In larger projects, we always double-check to ensure that the correct outlets and power requirements are provided by the construction team.